Mobile
Log In Sign Up
Home > chinese-english > "construction sequence" in English

English translation for "construction sequence"

施工程序;施工步骤
装配顺序


Related Translations:
construction:  n.1.建筑,结构,构造,架设,铺设;建设;设计;工程;建筑法,构造法,建筑物;【戏剧】搭置,布景,结构,编排。2.(法律等的)解释;推定。3.【语法】结构(体);句法结构;构词法;【数学】作图。短语和例子capital construction基本建设。 the order of construction施工程序。 a sandwich construction层状结构。
preset sequence:  给定程序装置前程序
insertion sequence:  插入顺序插入序列[有时特指细菌中最小的一种仅含转座酶的转座因子插入语列
fog sequences:  雾景
sequencing primer:  dna测序引物测序引物
approximating sequence:  近似序列
slippery sequence:  滑动序列
earthquake sequence:  地震序列
deposit sequence:  焊着顺序熔敷次序
Example Sentences:
1.Using scaffolds with good flexibility can change construction sequence and accelerate construction progress
巧用脚手架加快工程进度的方法
2.It presents the computation models of different construction conditions , based on construction sequence and technologies
根据施工顺序和施工工艺,确定不同工况下计算模型。
3.In this paper , a method for elastoplastic back analysis simulating tunneling construction sequences is proposed
本文从工程实践出发,提出了一种全新的弹塑性仿真反分析方法。
4.Optimization of the construction sequence and anchoring parameters in the large underground cavern excavation of shuibuya project
水布垭大型地下厂房施工顺序和锚固参数优化分析研究
5.We make good arrangements for the construction sequence to build the perfect city oh operations guide : mouse control can
要安排好建筑的先后顺序才能建成完美的城市哦!操作指南:鼠标控制就可以啦
6.Introduction : we make good arrangements for the construction sequence to build the perfect city oh operations guide : mouse control can
攻略:要安排好建筑的先后顺序才能建成完美的城市哦!操作指南:鼠标控制就可以啦
7.5 . the project completion probability is discussed , which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit
5 .进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
8.The expressions of displacement fields of dorsal and frontal surface for two piles , row piles and group piles are derived . the solution taking into consideration the effect of construction sequence of jacked pile accords with the actual engineering
该式考虑到了沉桩施工顺序的影响,较各桩的简单叠加更符合工程实际情况,而且能够简化为不考虑施工顺序的静压群桩挤土位移场的解答。
9.Considering the actual condition of this tunnel , several key mechanical problems involved in the construction of the tunnel have been studied : the comparison of three - heading construction method and benching tunneling method , and the construction sequence of the two tunnels is carried out
本文结合该工程实际,进行黄土连拱隧道的关键施工力学问题研究:正洞上下台阶法与侧壁导洞法施工方案比较研究;先左洞(靠山一侧)施工方案和先右洞施工方案的对比。
10.The influences of the properties of alluvium deposit , the properties of diaphragm wall concrete , the construction sequence of diaphragm walls , the distance between diaphragm walls and dam toe and the shape of diaphragm walls on the stress - deformation behaviors of diaphragm walls of concrete face rockfill dams were studied
研究了覆盖层特性、防渗墙混凝土特性、防渗墙施工顺序、防渗墙与坝趾之间距离和防渗墙形状对于面板堆石坝防渗墙应力变形性状的影响。
Similar Words:
"construction scheme" English translation, "construction science and management" English translation, "construction sealant" English translation, "construction section" English translation, "construction sepcification" English translation, "construction service" English translation, "construction shaft" English translation, "construction shed" English translation, "construction sign" English translation, "construction site" English translation